The Engineering Technology Department is moving!
Rennovation of the eastern portion of North Engineering is currently underway. This rennovation will result in completely new and modernized facilities for the Department.
The photo above shows a portion of the North Engineering building, including the so called "saw tooth" area and the two-story (white brick) office building, that will house the ET Department.
This photo has annotations added that indicate the approximate location of ET spaces.
The photo above shows the east side of the two-story office building (looking south) that is being remodeled for the ET department. The row of windows is new, allowing some faculty offices to have natural light.
This photo is taken from the doorway of the chairman's office, looking south down the hall leading to faculty offices. The natural light from the new windows is evident.
This photo shows the segmented window and entrance to the Department's drafting lab.
This photo is taken in front of the first-floor draftinig lab, looking north along the hall of the two-story office building. The "preferred" entrance to the department offices is the daylight at the end of the hall.
The photos above show the "preferred" entrance (mentioned above) at the north of the office building. Top 07/11/09, bottom 08/02/09.
This is a photo showing the main entrance to the department offices (at right). The space in the background of the photo is the Departments new conference room.
This photo shows the interior of one of the first-floor MET labs. This lab is located in the saw-tooth area of NE.
This photo shows the new student lounge. The curved structure in the foreground is the top of what will be a curved segmented windowed wall - showcasing the student lounge.
This photo shows the entire length of the north-south hall, off of which are the drafting and capstone labs.
This photo is taken from the same location as the one above, but looking west instead of north. This hall provides access to the rest of North Engineering and the CET labs.
These photos show the interior of the new CET concrete lab. Top 07/11/09, bottom 08/02/09.
This photo shows the east west hallway - looking east - that leads from the front of North Engineering, through the sawtooth area, to the two story office building. The daylight at the end of the hall is the large window in the new student lounge.
This photo shows the IT/CSET lab service room.
This photo shows the interior of the IT server administration lab.
This photo shows the wide-area networking lab. Note cable trays located for student access.
These two photos show the open area outside of the second-floor networking labs that is intended as a student gathering/study area. Top 07/11/09, bottom 08/02/09.
This photo shows the second floor hall, from the north end looking south.
This photo shows the second floor hall, from the south end looking north.